I. The project is invested in and constructed by Daqing Yinhang Petrochemical Co., Ltd.
II. Total project investment: RMB 50 million
III. Annual Production Lubricating oil 50,000 tons, with an output value of RMB 600 million and annual profits and taxes totaling RMB 120 million.
IV. Sincerity and Excellence Forge Brilliance — Guiding the Way Lubricating oil Shining Harbin Fair
Project Overview
The project covers a land area of 25,000 square meters and has a total floor area of 10,000 square meters, including one factory building with a floor area of 5,000 square meters.
Square meters; one office building covers 3,000 square meters, and the tank farm spans 2,000 square meters, with a storage capacity of 6,000 tons.
Project Schedule
August 8, 2008 – December 30, 2008: Construction of Factory Building No. 1 and the 2,500-ton tank farm;
March 15, 2009 – August 30, 2009: Construction of the No. 2 2,500-ton tank farm at the Yinhang Petrochemical Office Building.
Construction Entity: Daqing High-tech Industrial Development Zone Yinhang Petrochemical Co., Ltd.
Project Leader: Zhang Guojun
Design Unit: Daqing High-tech Zone Planning, Design and Architectural Design Institute
Project Leader: Li Ziyu
Contracting Contractor: Harbin Longqing Construction Company
Project Manager: Jiang Liguo
Supervising Unit: Daqing JianDa Engineering Supervision Co., Ltd.
Commencement Date: August 8, 2008
Completion Date: September 30, 2009
|